Home   
   Aircraft Sales   
   Services   
   Custom Built Aircraft   
   Upgrades & Mods   
   *Maint & Tech Info   
   190/195 Information   
   Links   
   Photo Gallery   
   Interesting Stuff   
   Company Information   
   Aviation Store   

galButton.jpg

barronServices.jpg


barronMaintain.jpg

logoLeft.gif

Door Posts

wpe9e.jpg

CESSNA 190/195 DOOR POST CRACKING

Upper door post cracking is one of the common problems with the 190/195.  This problem seems to be slightly worse with the right posts than the left. (probably due to more flexing with the cutout for the entry door).

Most of the cracks we have seen have been in the upper curve areas with some around and between the upper hi-shear and bolt holes (see pictures below).

Actions to avoid cracks: 1) Dress and blend any rough surfaces in the bend areas of posts. This needs to be done prior to installation. 2) When installing, make sure posts fit together and against spar carry through flat and unobstructed prior to fastening and torquing bolts down.  Follow correct torques for bolts and do not allow bolt to turn while tightening or installing. 3) John Collett, at Butterfly Aviation, has upper steel reinforcement plates available for door posts. 4) DO NOT drill any rivet holes or interior mounting screw holes in the bend area where these cracks mostly occur.

Many of these cracks are very difficult or impossible to see with posts and surrounding pieces installed in aircraft.  The cracks around bolt holes below were only visible once bolts were removed.  The crack in the right rear post was found only after front post was removed.

These areas should be inspected thoroughly prior to purchasing a 190/195 especially on aircraft with wing or gearbox damage history.  To date, we are not aware of any catastrophic structural failures/Hull Loses, due to upper door post seperation, however, any cracking in a main structural member is strictly unacceptable.  If anyone has any input or experiences to share, please send them to our e-mail address barron@nemonet.com.

Note; if reinforcement plates are used to repair a stop drilled crack (acceptable only in the parallel lip surface of the door post), the CFR's require follow up inspections to verify crack stability. Depending on whick post is cracked, this could be very difficult.

wpe1e.jpg wpe3e.jpg
wpe5e.jpg wpe7e.jpg

Copyright ©2005 Barron Aviation \ Terms Of Use \ Privacy Statement \ Login \ Powered By Onshore